100KW Solar For Hotels And Resorts In Nigeria

0

Published by Mars January 18,2025

In December 2024, the Mars Solar 100KW Nigeria solar for hotels and resorts project was successfully completed.

In May 2024, the customer contacted Mars solar and had a series of communications on the solar for hotels and resorts project.

The details are as follows: https://www.solarpowermanufacturer.com/News/commercial-solar-power.html

 

After determining the plan, David came to Mars Solar to communicate with Mars Solar engineers many times, confirmed that the quality and service of Mars Solar systems were very good, and finally decided to start the first hotel project with Mars Solar.

 

solar system manufacturer

Mars Solar produced all the products needed for this 100KW Solar for hotels and resorts system within 1 month.

Two months later, this 100KW solar for hotels and resorts system arrived in Lagos, Nigeria.

Mars Solar engineering team provided 2 solutions for the customer's solar for hotels and resorts

 installation:

1. Mars Solar sent engineers to the customer to provide installation guidance for the customer;

2. Mars Solar local certified engineers installed the system for the customer, and the Chinese engineering team provided system connection diagrams and installation videos as technical support.

 

Since the customer needed to install this solar for hotels and resorts system  urgently, they finally chose Mars Solar local certified engineers in Nigeria to install the system. The customer was very satisfied.

 